Specifically designed for red bag Medical wastes with high density and high moisture content.
Each chamber should have at least one temperature sensor
One temperature sensor mounting point at the base of the exit flue ensuring that chamber reaches the necessary 800°C minimum.
Minimum 50-100% moisture

Items/Model

TS100(PLC)

Principle

Waste Incineration

Waste Treatment

Animal Waste Incineration Treatment

Burn Rate

Average 200 kg/hour

Feed Capacity

Average 1000kg

Control Mode

PLC(Programmable Logic Controller Incinerator)

Combustion Chamber

1200L

Internal Dimensions

120x100x100cm

Secondary Chamber

600L

Smoke Filter Chamber

Yes

Feed Mode

Manual

Voltage

220V

Power

0.7Kw

Oil Consumption (kg/hour)

17–36

Gas Consumption (m3/hour)

11–36.7

Temperature Monitor

Digital Display

Temperature Protection

Yes

Oil Tank

200L

Feed Door

80x60cm

Chimney

10Meter

Chimney Type

Stainless Steel

1st. Chamber Temperature

800-1000

2nd. Chamber Temperature

1000-1200

Residency Time

2.0 Sec.

Gross Weight

6000kg

External Dimensions

260x150x180cm


Blood, drips, human faces
Human organs
Human tissues
Majority of Cancer treatment wastes
Majority of Pharmaceuticals
Surgery waste
Syringes/Needles/Sharps
Apart from the manual loading of waste, the incinerator should be automatic and easy to use or Plug and play modal
The incinerators shall be able to be operated with the following three forms of fuel and gas: Diesel, LPG and N-Gas.
Maximum load capacity of a minimum of 100kg
Burn Rate of anywhere between 50 – 80 kg/hr
Thermal Capacity 190 kwg/hr or less

Fuel Fillers,Blast Tubes,Nozzles
Diffusers,Primary & Secondary Chamber Thermocouple
Burner Ionization Probes,Burner Ionization Leads
Burner Flame Control Box,Burner ignition transformer
Complete spare burner,Thermal Resistor
It should use a Power Supply of 50/60Hz or 210/230v
A minimum of 2 chambers 
The walls of each chamber should be constructed with high grade refractory brick of a thickness anywhere between 210 – 240mm 
Each chamber should have combustion burner air fans which are automatically controlled to ensure efficient heat distribution
The supplier shall be able to provide and replace all below mentioned major spare parts for a period of 5 years (from delivery), at their own cost.


Categories:

Tags:

Comments are closed

www.waste-incinerator.net
Open chat
Powered by