Model |
CA50 |
Picture |
|
Waste Treatment |
Waste Incineration Treatment |
Feed Capacity |
Average 100 kgs per feed |
Burning Rate |
Average 50 kgs per hour |
Burning Time per Feed |
Average 2 hour |
Control Mode |
PLC(Programmable Logic Controller Incinerator) |
Voltage |
220V |
Power |
0.7Kw |
Fuel |
Diesel oil |
Burner |
|
Feed Mode |
Manual |
Temperature Monitor |
Digital Display |
Fuel consumption (Oil) |
Average 16.6 Kgs/Hour |
Internal Dimensions |
100x80x |
External Dimensions |
230 x 130 x |
Waste combustion chamber |
560Liters |
Post Combustion Chamber |
280Liters |
Oil Tank Capacity |
200 Liters |
Door Opening |
70 x |
Chimney |
|
Gross Weight |
4500kgs |
Chamber Material |
Firebrick ,Refractory Concrete |
Max. Heat Value |
166,000Kcal/Hr. |
Operation Technical Specifications |
|
Solid Chamber temperature |
|
Gas Chamber temperature |
|
Chamber Anti-Rate |
|
Residency time |
2.0 Sec. |
Burning efficiency |
>98% |
Waste Lower Calorific Power |
3000Kcal |
Primary combustion
i. The primary combustion chamber shall be accepted as the primary combustion zone;
ii. The minimum combustion temperature of the primary chamber shall not be less than 800 degrees C;
Secondary combustion
The residence time in the secondary chamber shall not be less than 2 seconds;
The gas temperature as measured against the inside wall in the secondary chamber, not in the flame zone, shall not be less than as indicated in Lots 1-7 ;
Both the primary and the secondary temperatures shall be maintained until all the waste has been completely combusted;
Chimney
The chimney shall have a minimum height of 4 meters above ground level;
The minimum exit velocity of the emissions shall not be less than 10 metres/second;
High Temperature Waste Incinerator for medical and pharmaceutical waste
MOBILE INCINERATOR UNITS SPECIFICATIONS
Trailer mounted mobile incinerator units suitable for the following applications:
– Medical waste
– Domestic waste
– Industrial waste
– Animal cadavers
Burn Rate Minimum 50kg/hour
Gas Retention Time 2 Seconds
Fuel Diesel/LPG/LNG
Power Supply for Control Box 220V -240V, single phase 50-60Hz
Minimum operating temperature 850 °C
1) Operation Manual And Training Manual For Each Incinerator Provided As Part Of Bid Package
2) Set Up And Installation Instruction Manuals Provided As Part Of Bid Package
3) Blue Print/ Schematic Provided That Outlines The Physical Dimensions Of The 20-Foot Containerized Incinerators
4) Delivery Plan To Explain The Movement Of 20-Foot Incinerators From Point Of Origin To Camp Arifjan, Kuwait
5) Mobility Plan To Explain How To Move 20-Foot Incinerators From Base To Base Within Us Army Central Command Theatre
6) Incinerators Composed With Heavy Duty Welded Construction
7) Each Individual Unit Operated And Transported In A 20-Foot Iso Shipping Container
8) Unit Can Be Fully Accessed, For Maintenance And Operation
9) Primary / Secondary Temperature Controls
10) Combustion Air Damper
11) Vapor Tight Light Fixtures & 120v Outlet
12) Outdoor Plug-In Receptable For Electrical Source
13) Outdoor Fuel Train With Shut-Off
14) Load Ramp
15) Skid C Mounted Fuel Tank
16) Electrical And Fuel Oil Connectors
17) Control Panel And Air Louver
18) Air Manifold Access And Utility Bulkhead
19) Galvanized Shipping Covers
20) Fuel, Water, And Oil Connector Lines
21) Primary And Secondary Burners
22) Fully Integrated Programmable Logic Controller (Plc) System
23) Factory Tested, Wired Prior To Shipment
24) Any Assembly And Disassembly Necessary For Operation Of The Unit Will Not Exceed 2-Hours, Must Be Able To Be Completed By 1-Person, And Does Not Require The Use Of Heavy Equipment (E.G. Forklift, Cranes, Etc.)
25) Height Of The Entire System When In Operational Configuration (Measured From The Base Ofof The Container, To The Highest Point Of The Unit) Is Not To Exceed A Maximum Height Of 15-Feet.
Comments are closed